292022 EGGXZOZX
(NAT-1/2 TRACKS FLS 340/390 INCLUSIVE
AUG 30/1130Z TO AUG 30/1900Z
PART ONE OF TWO PARTS-
A GOMUP 59/20 60/30 60/40 59/50 AVUTI
EAST LVLS NIL
WEST LVLS 340 350 360 370 380 390
EUR RTS WEST GINGA
NAR N838C N850C N848C N842C N844B-
B SUNOT 58/20 59/30 59/40 58/50 CUDDY
EAST LVLS NIL
WEST LVLS 340 350 360 370 380 390
EUR RTS WEST NIL
NAR N802C N806C N804C-
C BILTO 5730/20 5830/30 5830/40 5730/50 ENNSO
EAST LVLS NIL
WEST LVLS 350 360 370 380 390
EUR RTS WEST NIL
NAR N768A N776B N772A-
D PIKIL 57/20 58/30 58/40 57/50 HOIST
EAST LVLS NIL
WEST LVLS 340 350 360 370 380 390
EUR RTS WEST NIL
NAR N746B N754B N750B-
END OF PART ONE OF TWO PARTS)
292023 EGGXZOZX
(NAT-2/2 TRACKS FLS 340/390 INCLUSIVE
AUG 30/1130Z TO AUG 30/1900Z
PART TWO OF TWO PARTS-
E RESNO 56/20 57/30 57/40 56/50 JANJO
EAST LVLS NIL
WEST LVLS 340 350 360 370 380 390
EUR RTS WEST NIL
NAR N710B N714B-
REMARKS.
1. TMI IS 242 OPERATORS ARE REMINDED TO INCLUDE THE
TMI NUMBER AS PART OF THE OCEANIC CLEARANCE READ BACK.
2. SEND RCL 90-30 MINUTES PRIOR TO OCEANIC ENTRY POINT.
3. PBCS OTS LEVELS 350-390. PBCS TRACKS AS FOLLOWS
TRACK B
TRACK C
TRACK D
END OF PBCS OTS
4. INCLUDE THE MAX LEVEL IN RCL.
5. CLEARANCE MAY DIFFER FROM THE FLIGHT PLAN, FLY THE CLEARANCE.
6. STRATEGIC LATERAL OFFSET PROCEDURE SHOULD BE USED FOR
ALL OCEANIC CROSSINGS. LEFT SLOP IS PROHIBITED.
7. 10 MINUTES AFTER PASSING OEP SQUAWK 2000 UNLESS OTHERWISE
INSTRUCTED.
8. NAVIGATION ERRORS CAN BE PREVENTED BY THE USE OF PROPER FMS
WAYPOINT PROCEDURES.
9. OPERATORS ARE REMINDED TO ONLY USE NAT TRACK DESIGNATORS IN FLIGHT
PLANS WHEN FLYING THE WHOLE LENGTH OF THE NAT TRACK.
10. ADS-C AND CPDLC ARE MANDATED FOR LEVELS 290-410 IN NAT AIRSPACE.
11. UK AIP. ENR2.2 PARA 3.5.2 STATES THAT
NAT OPERATORS SHALL FILE PRM'S.
12. OPERATORS SHOULD REFERENCE NAT DOC 007 CHAPTER 8 AND 13 FOR
SPECIFIC
NAT OCEANIC PROCEDURES.
13. DATA LINK EQUIPPED FLIGHTS NOT LOGGED ONTO DOMESTIC AIRSPACE,
PRIOR TO ENTERING THE SHANWICK OCA, MUST INITIATE A LOGON TO
EGGX 10-25 MINS PRIOR TO OCA ENTRY.
14. EGGX HAS DELAYED IMPLEMENTATION OF OCR UNTIL FURTHER NOTICE.
15. DUE TO THE CONTINUED IMPACT OF PRE BOUNDARY GNSS INTERFERENCE,
CREWS ARE REMINDED OF THE REQUIREMENTS TO NOTIFY OF ANY INTERFERENCE
IN RCL AS PER UK AIP 3.7.4.-
END OF PART TWO OF TWO PARTS)
|